Posted May 16, 2013 in
(5) New Buildings: Campus Voice/Data Distribution Design for the entire complex, conduit duct bank design and Audiovisual Systems Design for eighty spaces including lecture halls, classrooms, teaching labs, videoconference rooms, and performing arts theatre. This facility is built on a former Military installation which required extensive research of existing cable infrastructure and coordination with the U.S. Army Corps of Engineers to remove/relocate existing services without compromise to National Security. It also had several Learning Laboratories which had to incorporate real world lab functions with suitable instruction amenities.
Technology Budget $3.2M – Actual $3.1M